Headquarters

C.E. Gleeson Constructors, Inc.

984 Livernois Road

Troy, MI 48083

p.248.647.5500

f.248.647.5530


View Map

Southeast Division

Gleeson Builders, LLC

2331 Crownpoint Executive Drive, Ste C

Charlotte, NC 28227

p.704.553.2000

f.704.553.2828


View Map

Southwest Division

C.E. Gleeson Constructors, Inc.

1250 Capital of Texas Hwy. South, Bldg III, Suite 400

Austin, TX 78746

p.512.501.2575

f.512.501.2622


View Map

Florida Office

C.E. Gleeson Constructors, Inc.

1013 Lucerne, Suite 200

Lake Worth, FL 33460

p. 561.621.7900

f.  561.621.7901


View Map

INSTITUTIONAL CONSTRUCTION EXPERTS

Municipal Buildings -  police stations - fire stations - high schools 

Our Institutional Construction Services


Signature Project:

Broadway Public Safety Station

  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button

Client: City of Ashville

Location: Ashville, NC

Project Description: The facility is public safety station consisting of a 3-bay fire station, a police station, and an emergency operations center.

The 3-story facility structure is a combination of masonry bearing walls, concrete retaining walls, and structural steel framing. The building exterior consists of brick veneer, modular stone veneer, metal wall panels, cement fiber siding panels, and architectural precast concrete caps and sills. Facility amenities include an apparatus room, locker rooms, administrative offices, community room, fitness room, dormitories, kitchen, and laundry room.


The facility obtained a LEED Platinum Certification. Sustainable design components included photovoltaic roof panels and solar thermal water heating systems.

 

Key Stats:

  • 21,831 Sq Ft.
  • $10.9 Million Contract

Signature Project:

west bloomfield police station - renovation

  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button

Client: West Bloomfield Twp / Plante Moran CRESA

Location: West Bloomfield, MI

Project Description: The West Bloomfield Police Station completed a significant renovation project divided into three phases.


The initial phase, concluded in July, prioritized enhancements to the Patrol Division's facilities, encompassing upgraded flooring, paint, workspaces, tile, and restrooms. Additionally, it introduced a new communications hub serving multiple police departments and fire services, alongside supplementary amenities such as a wellness room.

Phase two, which commenced in August, entails the redesign of the lobby, front desk, and records bureau, alongside the construction of an outbuilding to address additional storage requirements. This phase also includes an expansion of the training room.


Phase three, the project's final phase, will involve the renovation and enlargement of locker rooms for both genders, as well as the establishment of a dedicated space for advanced de-escalation training utilizing the "VIRTRA SYSTEM" for state-of-the-art use of force simulations.


Gleeson developed a phasing and logistics plan to ensure uninterrupted operations during construction.


Key Stats:

  • 6,660 Sq Ft
  • $5.5 Million Contract

Signature Project:

sterling heights community center

  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button

Client: City of Sterling Heights

Location: Sterling Heights, MI

Project Description:  This 98,00 S.F. facility features a tot center, teen center, two gymnasiums, an indoor track, and dance and fitness rooms. 


Gleeson Constructors developed over $1.5-million in value engineering options that were incorporated into the final design while still completing the construction within the required timeline.


Key Stats

  • 98,000 Sq. Ft.
  • $28 Million Contract

Signature Project:

JOHN W. HODGE Public Safety center

  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button

Client: City of Hope Mills

Location: Hope Mills, NC

Project Description: This facility is a comprehensive safety center facility equipped to accommodate the Hope Mills Police Station and Fire Station.

The 2-story facility structure is comprised of a steel columns, beams, and joists. The radiused roof joists created an open, modern workplace. The building exterior elements include a veneer of face brick and aluminum curtain wall and a standing seam metal roof system. Facility amenities include a 4-bay apparatus room, locker rooms, administrative offices, training room, K-9 units, dormitories, and kitchen. The project was on the site of an existing fire and police station.


Gleeson developed a phasing and logistics plan to ensure uninterrupted operations during construction.


Key Stats:

  • 43,347 Sq Ft
  • $11.4 Million Contract
Share by: